We build power distribution assemblies, power cords and cable assemblies for our clients at our own plant in Imuris, Sonora. Every unit is hi-pot tested, continuity tested and inspected before it ships.
Micromex builds power distribution assemblies, power cords and cable assemblies for data center power at its own plant in Imuris, Sonora, under its Bridge Manufacturing model. Every unit is hi-pot tested, continuity tested and inspected before it ships, and Micromex employs everyone on your line.
We build power distribution solutions for our clients. You send the print and the bill of materials. We build it, test every unit and ship it.

Assemblies for data center power distribution, built to your print and tested before they leave the plant.

Power cords with connectors fitted, built to your print and checked one unit at a time.

Power cables, wire harnesses and cable assemblies, built to your print and tested before they ship.
Our current equipment handles crimping, soldering, ultrasonic welding, potting, overmolding and testing.
Keep your supply chain and consign material, let us source everything, or mix the two by part. There is no minimum order.
Every unit we build for data center power is hi-pot tested and continuity tested, and inspected before it ships. We don't batch test.
A high-potential test on every unit, not a sample from the lot.
Every unit checked for continuity before it moves on.
Every unit inspected before it is packed and shipped.


Micromex is ISO 9001:2015 certified, and our work is backed by a 100% Quality Assurance Program.

With Micromex Bridge Manufacturing, your power assemblies are built in our own plant in Imuris, Sonora. We own the building, employ the people and handle the permits, quality and management. You stay as involved as you want to be.
How Bridge Manufacturing worksMicromex is the employer of every person on your line and carries the employment liability. You have zero employees on your books in Mexico.
Your engineers are welcome on our floor or on a call. Visit any time, station your own quality staff with the line, or check in from your desk.
An 80K sq ft production plant in Imuris, about 40 miles south of the Nogales, Arizona port of entry, managed from our Tucson headquarters.
The plant, IMMEX certification and trained workforce are already in place. A ramp-up can take as little as 30 days.
98% employee retention. We have capacity for up to 500 people in our current space, run one shift today and can add more.
Wages and Mexican benefits, supervisors and quality inspectors, engineering, floor space and electricity, management and admin, and IMMEX administration in one rate.
Documented process control, traceability and inspection as routine, backed by a 100% Quality Assurance Program.
UL and ETL where required. For the listings that apply to your product, ask our team at (520) 748-0101 or info@micromex.com.
Share prints, BOM, volumes and how involved you want to be.
Get a program proposal in about two weeks and tour the plant.
First-article inspection, process validation and your sign-off.
Scale to volume with weekly reporting. We staff the line; you carry no headcount.
Power distribution assemblies, power cords and connectors, and other power cables and cable assemblies, built to your print.
We build them at our own plant in Imuris, Sonora, under our Bridge Manufacturing model.
Every unit. Each one is hi-pot tested and continuity tested, and inspected before it ships.
We don't batch test. Micromex is ISO 9001:2015 certified, and our work is backed by a 100% Quality Assurance Program.
No. Micromex is not a contract manufacturer and not a shelter.
Our model is Micromex Bridge Manufacturing: we own the plant in Imuris, employ everyone on your line and carry the employment liability, while you keep full visibility and as much control as you want.
Across our programs, you get a program proposal in about two weeks, and a ramp-up can take as little as 30 days.
Once a program is running, typical production lead time is about two weeks. Your proposal includes a timeline for your product.
Either. Consign your material, let us source everything, or mix the two by part.
Under IMMEX, imported material for export production has its duties deferred either way. There is no minimum order, and we build low-volume prototypes as well as full production runs.
Yes. Your engineers are welcome on our floor or on a call.
The plant is in Imuris, about 40 miles south of the Nogales, Arizona port of entry. The best airport for US visitors is Tucson International. Don't forget your passport.
Tell us what you build, your volumes and what you want to improve. We'll come back with a recommended program, a cost estimate and a timeline, and an honest answer on whether we're the right fit.
(520) 748-0101 · info@micromex.com · We reply within one business day.